Over the years, Rojeks Industries Nigeria Limited has successfully executed many projects, some of which are listed below: -
Federal Government of Nigeria
Lay/Weld of more than 10km X 36” Gas Pipeline
Shell Pet. Dev. Coy of Nigeria Ltd / Nigerian Gas Company Limited JV
Sectional replacement of yokri 4” w/117L flowline /sectional replacement of Yokri 6” HP bulk line at manifold 3 and fabrication/ installation of Yokri flowstation leaking LP inlet Test Separator spool piece
Lay/weld of more than 18km x 12” gas/ crude oil pipelines
Shell Pet. Dev. Coy of Nigeria Ltd
Construction Of 5nos Oil/ Storm Water Saver Pit at land manifolds: Provide land logistics and execute 5nos Manifold Rehabilitation Works at WRPC, Rapele, Amukpe, Oben, Kokori Locations And R.O.W land locations.
A). Manifold Rehabilitation Works
B). R.O.W Sign Post Rehabilitation Works
Opukushi wells 18L/S, 5S, 7T wellhead platform refurbishment and flowstation fenders replacement
Repair of leak on saver pit skimmer line and coupling/ minor civil works at generator / base of water tank at Yokri flowstation
Replacement of otumara well 5S gas line and integrity checks on well 55T flowline
Flowline replacement of opukushi well/18L
Repair of pump suction header gas riser; including construction of walkways to helipad @ Forcados North Bank flowstation
Lay/weld of more than 300km x (2”- 12” diameter) of gas, crude oil and water hydrant pipelines
Replacement of more than twenty (20) units of damaged 30"/20”/18” diameter Boskel Smokeless flare stack @ various Shell Petr. Dev. Coy. Locations; including replacement of damaged section of flare walkway/ painting work
Replacement of Otumara well 5S gas line and integrity checks on well 55T flowline
Chevron Nig. Ltd / Nigerian Gas Company / Nigerian Pet. Dev. Coy Ltd JV
Flushing/ Foam Pigging/ Hydrotest of more than 100km X 60” diameter Gas Pipeline & Spools
Flushing/ Foam Pigging/ Hydrotest of more than 80km X 48” diameter Gas Pipeline & Spools
Flushing/ Foam Pigging/ Hydrotest of more than 200km X 40” diameter Gas Pipeline & Spools
Flushing/ Foam Pigging/ Hydrotest of more than 100km X 36” diameter Gas Pipeline & Spools
Shell Pet. Dev. Coy of Nigeria Ltd / Nigerian Pet. Dev. Coy Ltd JV
Flushing/ Foam Pigging/ Hydrotest of more than 1000km X 6” diameter Gas/ Crude Oil Pipelines
Flushing/ Foam Pigging/ Hydrotest Of More Than 5000km X 4” diameter Gas/ Crude Oil Pipelines
Bayelsa State Nigeria
Award Of Contract for the construction of three Bedroom Duplex Row House with Boy’s Quarters at the New Ekeki Housing Estate, Yenagoa….. 3 Nos